# Describe the documented bungalow project without a style checklist.

A bungalow home project page should connect the approved bungalow label to that project's documented form and room arrangement. Explain the roof, entrance and room connections only where current drawings support them. Help buyers identify choices they want to discuss, while keeping unknown features and future project scope unresolved.

## What does bungalow describe on this project?

Start with the approved project description. Find the record that uses bungalow and confirm what it describes. The label might apply to a proposed exterior or a completed project. Keep that distinction in the page introduction. An early concept title should not silently become the description of a finished house.

Separate the label from the observations that follow it. Approved label answers what the project team calls the house. Visible form answers what a particular view depicts. Plan relation answers how named spaces connect in the relevant drawing. Each field needs its own supporting record.

Do not use bungalow as a substitute for a floor-plan explanation. Leave story count, bedroom locations and stair relationships unknown until project records establish them. Do not substitute cottage or ranch because a photograph suggests a resemblance. Use the approved wording for this house without making a universal style checklist.

A useful project page gives buyers something more specific than a label to discuss. Choose the documented arrangement that best answers their likely question. That could be the entrance sequence or the connection between gathering spaces. Let the evidence determine which subject belongs on the page.

The [positioning article library](/articles/positioning/) covers broader company decisions. Keep this description focused on one example. The [modern project evidence guide](/articles/positioning/modern-home-project-page-evidence/) provides related guidance on separating a project label from the builder's contribution.

## How do form and plan evidence answer different questions?

Choose a roof observation that the approved drawing can demonstrate. Name its location and relationship to the entrance or adjoining building form. If the drawing does not establish a pitch, assembly or material, omit those details. Describe the depicted shape without explaining technical performance.

Then trace the entrance on the matching plan. Identify the named space immediately inside the entry and any documented connection you intend to explain. Check the drawing's room labels rather than assigning a use from furniture symbols. Keep passage through a room distinct from direct access to it.

Use this comparison to decide which source answers each buyer question. The rows are editorial prompts, not bungalow features or design requirements.

| Buyer question | Record to inspect | Wording boundary |
| --- | --- | --- |
| How does the roof relate to the entry? | Approved exterior elevation showing both | Describe the depicted form without inferring a hidden assembly. |
| Where does the entry lead? | Matching plan with confirmed room names | Name the connection without inventing dimensions or circulation benefits. |
| Which gathering spaces connect? | Current plan and relevant project description | State the relationship without assuming a household's experience. |
| Was a pictured detail selected for this house? | Project selection record and current status confirmation | Distinguish the project choice from future included scope. |

Check whether the elevation and plan show the same revision. If the entrance moved, an older elevation may no longer explain the current room arrangement. Ask the project reviewer to settle the mismatch. Keep the affected sentence out until the records agree.

A drawing description should identify its stage. Say the approved plan shows a relationship when that is all you know. Reserve completed-project wording for a condition confirmed as built. A rendering alone does not close that gap.

For detail-focused descriptions, use the [Craftsman project detail brief](/articles/positioning/craftsman-home-project-page-content/) as adjacent reading. Keep its subject separate from this form-and-plan exercise. A detail in either example does not establish a rule for all houses carrying that label.

## How do you complete the bungalow description sheet?

Copy this proposed worksheet into your internal project brief. Complete a separate record for each relationship you might describe. The worksheet is an AgAI Labs editorial proposal. It is not an architectural standard or a form issued by an official organization.

```
Bungalow description sheet
Approved label:
Visible form:
Plan relation:
Source record:
Optional detail:
Unknown fact:
Buyer question:

Revision and project stage:
Factual review role:
Asset publication permission:
Proposed public sentence:
```

In approved label, record the exact wording and its scope. In visible form, describe what the elevation depicts. In plan relation, name the connected spaces using the drawing's labels. Avoid adding a reason unless an approved project note explains that reason.

Source record identifies the exact drawing and relevant location. Keep its revision beside the reference. Optional detail records a documented selection or proposed alternative with its actual status. If optional status is unknown, write unknown. Do not create an option menu from a gallery.

Use unknown fact to prevent accidental completion of a missing detail. Missing floor levels, installed finishes, design responsibility and publication permission remain separate questions. An attractive description of the roof cannot answer any of them.

Buyer question connects the observation to the inquiry it can support. Ask which room connection the reader wants to discuss. Avoid assigning preferences to retirees, young households or any other presumed audience. A documented choice can start a conversation without defining who should live there.

Read the proposed public sentence against every field. If it introduces a benefit absent from the worksheet, remove that benefit or request evidence. Keep the private source reference out of the published excerpt. Retain enough information internally for another reviewer to locate it.

## What would a fictional bungalow page say?

This unnamed example is entirely fictional. It illustrates the worksheet and does not describe a real house or an AgAI Labs construction project. Assume a project description approves the bungalow label. Assume matching, cleared plan and elevation excerpts belong to the same proposed revision.

The fictional elevation depicts a roof segment above the entry. The fictional plan places that entry beside a gathering room, with a dining area connected to it. An alternate drawing depicts a different entry arrangement. The record marks the alternate as unselected. All dimensions, materials and installed conditions remain unknown.

The description sheet records the roof-to-entry relationship under visible form. It records the entry and room connections under plan relation. Optional detail identifies the unselected alternate without offering it for sale. Unknown fact includes construction status and whether the alternate could apply to another site.

Fictional public-page excerpt: This proposed project uses the approved bungalow label. The elevation depicts the roof above the entrance. The matching plan shows the entry beside the gathering room and the connected dining area. These drawings describe the selected proposal, not a completed house or a standard package.

The excerpt gives buyers a specific relationship to discuss. It does not describe the arrangement as efficient, easy to build or affordable. It does not predict how a household will use the rooms. Those claims have no source in this fictional record.

A buyer could ask whether another entrance arrangement merits discussion for a new brief. That question does not establish an available option. Keep the unselected alternate in the internal record unless its public explanation serves a clear purpose and receives approval.

Use the [Prairie project worksheet](/articles/positioning/prairie-home-project-page-content/) when the central question concerns elevation differences and option status. Keep the bungalow sheet centered on form and room connections. Do not borrow a second project's label to complete the first description.

## How should these choices guide the buyer conversation?

Ask readers to identify the relationship they want to explore. A reference to the entry beside the gathering room is more precise than a request for a bungalow. Record that preference separately from room requirements, plan status and homesite questions. Leave unanswered questions visible in the private brief.

Before publishing the explanation, follow this sequence:

1. Confirm the approved bungalow label and its project scope.

2. Match the elevation and plan revisions.

3. Record the roof, entry and room observations separately.

4. Complete the description sheet, including unknown facts.

5. Confirm permission for each proposed public asset.

6. Review the excerpt beside the exact drawings it describes.

7. Keep future project questions separate from this example's documented choices.

The [FTC's truth-in-advertising overview](https://www.ftc.gov/news-events/topics/truth-advertising) says advertising must be truthful and non-misleading. Apply that boundary to both explicit sentences and the impression created by paired drawings. A proposed plan beside a completed image should not imply an established match without confirmation.

Confirm drawing publication permission separately from factual accuracy. The [U.S. Copyright Office's Circular 41](https://www.copyright.gov/circs/circ41.pdf) distinguishes architectural works from technical drawings. It does not grant permission to publish a particular plan. Hold an uncleared asset rather than treating possession as authorization.

If a cleared drawing carries complex information, provide its essential relationships in text. [W3C guidance on complex images](https://www.w3.org/WAI/tutorials/images/complex/) describes short and long text alternatives. Make the room relationship understandable without relying on the drawing alone. This publishing guidance establishes no property feature.

Use the [custom builder website pages guide](/guides/custom-builder-website-pages/) to place the example within your site. Bring confirmed project choices into the [Positioning stage](/process/positioning/) when they explain your work. Keep this project's scope attached to every reused description.

## Which bungalow project questions need separate answers?

### Does the bungalow label establish the bedroom level?

A bungalow label does not establish bedroom locations for a project description. Check the current plan and approved room labels. Describe only the locations those records confirm, with the proposal or completed stage identified.

### Can one drawing explain the roof and room connections?

A bungalow project page should use evidence suited to each observation. An elevation can support a depicted roof relationship. A matching plan can support room connections. Confirm that the drawings describe the same project revision before combining their explanations.

### How can you describe buyer fit without household stereotypes?

Describe bungalow project choices that buyers can reference, such as a documented entry and room connection. Ask which arrangement they want to discuss. Do not infer household type, affordability or construction simplicity from the project label.

### Should a past bungalow choice become a standard inclusion?

A choice documented for one bungalow project stays within that example's scope. Confirm current included scope separately before describing the choice as standard. Leave future availability and suitability unresolved when the records do not establish them.
