# Explain the poolhouse as its own documented building scope.

A poolhouse project page should describe the accessory building through documented room labels, entries and connections to the pool. Keep its scope separate from the main house and pool installation. Explain changing, storage, bathroom and service provisions only where records support them. Leave unrecorded utilities, approvals and permitted uses unresolved.

## What makes the poolhouse a separate project description?

Give the poolhouse its own building description even when it shares a project gallery with the main house. Start by identifying the accessory structure in the approved project records. Explain its documented relationship to the pool before describing finishes or showing interior photographs.

Keep the three descriptions distinct: main house, poolhouse and pool installation. A package that includes one does not establish the scope of the others. Your [pool project page](/articles/builder-websites/pool-project-page-content/) can explain the shell, deck and equipment. Use the poolhouse page to explain the building and its rooms.

Write the relationship in ordinary language. State which entry faces the pool when a cleared drawing supports that description. Identify which rooms belong to the accessory structure. Avoid a combined room list that could make a poolhouse bathroom appear part of the main house.

If the project records do not settle a building's status, keep that question open. Do not turn a familiar marketing label into a statement about approved use. The page can describe what the reviewed documents show while directing unresolved status questions to the responsible project reviewer.

The [project gallery guide](/articles/builder-websites/project-gallery-pages-that-sell/) covers the parent project record and image captions. Keep the poolhouse description narrower: rooms, entry relationships, recorded fit-out and the boundaries between construction packages.

## How should you describe changing, storage and bathroom rooms?

Begin with the room labels in the drawing selected by your project reviewer. Record the revision and the room's location within the accessory building. Keep the approved label separate from your interpretation of how a buyer might use the space.

A room called storage should remain storage in the page brief unless the reviewed records support another description. Furniture in a photograph does not establish sleeping use. A cabinet layout does not establish a kitchen. An exterior door does not establish dwelling status or rental permission.

| Room description to verify | Fit-out and unresolved use |
| --- | --- |
| Changing room. Confirm the approved room label and entry relationship. | Which fittings are included? Do not infer bathroom facilities without supporting records. |
| Storage room. Confirm the recorded storage purpose and location. | Which shelves or cabinets are confirmed? Staged furniture does not establish sleeping accommodation. |
| Bathroom. Confirm the room label and recorded fixture scope. | Is fit-out specified or confirmed installed? Leave unrecorded utilities and approval status unresolved. |
| Service area. Confirm the documented function and responsible package. | What equipment or connections are recorded? Counters and cabinets do not establish kitchen use. |

Describe fit-out as a separate field. A drawing can identify a bathroom location while another record establishes its included fixtures. An installation record answers a different question from a proposed schedule. Use wording that preserves those distinctions.

Keep service provisions specific to the known scope. If a reviewed document identifies an equipment room, use that label. If it identifies only an unassigned service zone, ask for clarification. Do not fill the gap with an assumed utility connection or an equipment specification.

For each room, ask what the buyer needs to understand before discussing a similar project. The answer may be the entry location, separation from storage or an unresolved fit-out choice. Avoid turning the page into a catalog of hypothetical features that the example does not document.

## Which records explain rooms, entries and routes to the pool?

Ask the project reviewer to identify the controlling record for each description. Record room labels from the applicable building drawing. Check the site relationship against the applicable site drawing. Check included work against the approved scope document. Do not let a promotional rendering override those records.

Use the entry descriptions to orient the reader. Identify the documented starting room, exterior opening and destination. A route from the main house to the poolhouse is separate from a route from the poolhouse to the pool. State only the relationships that the reviewed drawings establish.

Keep approval types separate in your internal brief. Permission to publish a plan does not establish a construction approval. A room label does not resolve permitted occupancy. A drawing revision does not prove that the depicted work has been installed.

### How do drawings connect to the website's plan library?

If the poolhouse appears beside a house plan, explain the relationship between the two designs. Label the accessory building separately. The [plan library guide](/articles/builder-websites/plan-library-pages/) explains design status and starting-plan boundaries. Avoid making a project-specific poolhouse appear included with every version of the house plan.

Before publishing a drawing, ask the rights reviewer to confirm the permitted material and use. The U.S. Copyright Office's [Circular 41](https://www.copyright.gov/circs/circ41.pdf) distinguishes an architectural work from a technical drawing. It does not establish permission for your particular plan.

If a cleared plan communicates essential room relationships, provide those relationships in accessible text. The W3C [complex-images tutorial](https://www.w3.org/WAI/tutorials/images/complex/) describes a short identification and a longer text alternative for complex images. Explain the approved room labels and connections without exposing private drawing details.

Route pool barrier and access questions to qualified reviewers and the relevant local authority. The Consumer Product Safety Commission's [residential pool barrier booklet](https://www.cpsc.gov/s3fs-public/SafetyBarrierGuidelinesPub362_0423.pdf) directs readers to check local requirements on printed page one. Its guidance does not establish approval for a particular poolhouse entry or pool connection.

## What belongs in a copyable poolhouse brief?

Use a room-by-room brief before writing the public description. Copy the fields below for each building zone. This is a proposed editorial worksheet, not an official form. Keep internal evidence references with each completed entry so a reviewer can trace the wording.

```
Poolhouse brief
Building zone:
Approved room label:
Depicted use:
Fit-out status:
Utility question:
Scope owner:
Public excerpt:
```

The building zone field locates the room within the accessory structure. The approved room label preserves the drawing's terminology. The depicted use field records what an image shows without treating furniture or staging as permission for that use.

Use fit-out status to distinguish a proposed layout, specified work, confirmed installation and an unresolved condition. Use utility question for what still needs confirmation. Leave it open when the records do not establish connections or capacity. Do not convert an unanswered question into a public feature.

Identify the scope owner by role. Keep responsibility for building work, room fittings and pool equipment distinct where the records separate them. The public excerpt should describe the room with that boundary intact. Private contact details do not belong in the page copy.

### How would a fictional project fill out the brief?

Consider a fictional, unnamed poolhouse created only to demonstrate the worksheet. Its invented drawing labels a changing room, storage room and bathroom. Its invented scope confirms changing-room fittings and storage shelving. Bathroom fit-out and utility connections remain unresolved in this example.

The writer keeps the bathroom label because the fictional drawing supplies it. The writer does not call the bathroom completed or ready for use. A staged seating area stays a depicted arrangement. It does not become a bedroom, dwelling or rental unit.

A short public-page excerpt for the fictional example could read:

The poolhouse drawing identifies changing, storage and bathroom rooms in a separate accessory building. The example's recorded scope includes changing-room fittings and storage shelving. Bathroom fit-out and utility connections remain unconfirmed. The depicted room arrangement does not establish sleeping use, dwelling status or rental permission.

This excerpt illustrates document boundaries, not a real project or construction service. Replace its conditions with confirmed facts before using the structure for a live page. If a needed description remains unresolved, explain the question to the project reviewer.

## How do you turn the room brief into a useful public page?

Organize the page around what the accessory building contains and how its documented spaces connect. Give the buyer an orientation paragraph, a short room description and scope labels beside relevant images. Keep the main house description on its own project page.

1. **Identify the accessory building.** Confirm its project label and relationship to the main house.

2. **Map the rooms.** Copy approved labels from the applicable drawing revision.

3. **Trace the entries.** Describe documented routes to the pool without claiming access compliance.

4. **Check fit-out and utilities.** Separate confirmed work from proposed work and unresolved questions.

5. **Review the public excerpt.** Confirm each room description with its scope owner.

6. **Clear the publication material.** Confirm rights, privacy and the status labels beside each image.

The Federal Trade Commission's [truth-in-advertising overview](https://www.ftc.gov/news-events/topics/truth-advertising) says advertisements must be truthful and must not mislead. Apply that boundary to both room descriptions and captions. Do not imply a finished building package when the records support only a design.

Write a useful next question for the buyer. Ask which rooms and pool connections they want reviewed for their own project. Keep that inquiry separate from any suggestion that the shown building can be repeated or approved elsewhere. The recorded example is the starting context.

Place the page within the [builder websites article set](/articles/builder-websites/) and connect it to the relevant project. The [custom builder website pages guide](/guides/custom-builder-website-pages/) explains the broader page structure. The [Owned website stage](/process/owned-website/) covers website assets and accounts you retain after the work.

## What else should a poolhouse page make clear?

### Does a poolhouse bathroom make the building a dwelling?

A bathroom label on a poolhouse drawing does not establish dwelling status. Keep room descriptions separate from permitted use. Ask the qualified project reviewer and relevant local authority to resolve status questions before making a public claim.

### Can staged furniture establish sleeping or kitchen use?

Staged furniture does not establish approved poolhouse use. A sofa cannot establish sleeping permission, and cabinets cannot establish a kitchen. Base public room descriptions on the applicable drawings and scope records.

### How should a poolhouse page handle unknown utilities?

Keep unrecorded poolhouse utility connections unresolved. Ask the responsible scope owner for the applicable record. Describe confirmed room labels separately from fit-out and connections rather than implying that every depicted room is ready for use.

### Should the poolhouse and main house share one room list?

Keep poolhouse rooms in a separate list from the main house. Link the buildings through the parent project record. Identify the documented entries and pool connection so buyers understand which spaces belong to each structure.
